← Back to H.R. 11162

H.R. 11162 · Full text

Collaborative Combat Aircraft Sustainment and Readiness Assessment Act of 2026

Introduced in House · Nov 24, 2026 · 7,405 characters · Source on congress.gov →

[Congressional Bills 119th Congress]
[From the U.S. Government Publishing Office]
[H.R. 11162 Introduced in House (IH)]

<DOC>

119th CONGRESS
  2d Session
                               H. R. 11162

  To direct the Secretary of the Air Force, in consultation with the
Commander of United States Transportation Command to submit a report on
 storage and sustainment plans for autonomous, uncrewed collaborative
   combat aircraft of the Department of the Air Force, and for other
                               purposes.

_______________________________________________________________________

                    IN THE HOUSE OF REPRESENTATIVES

                           November 24, 2026

 Mr. Min (for himself and Mr. Joyce of Ohio) introduced the following
      bill; which was referred to the Committee on Armed Services

_______________________________________________________________________

                                 A BILL

  To direct the Secretary of the Air Force, in consultation with the
Commander of United States Transportation Command to submit a report on
 storage and sustainment plans for autonomous, uncrewed collaborative
   combat aircraft of the Department of the Air Force, and for other
                               purposes.

    Be it enacted by the Senate and House of Representatives of the
United States of America in Congress assembled,

SECTION 1. SHORT TITLE.

    This Act may be cited as the ``Collaborative Combat Aircraft
Sustainment and Readiness Assessment Act of 2026''.

SEC. 2. STRATEGY AND REPORT ON STORAGE, SUSTAINMENT, AND DEPLOYMENT OF
              COLLABORATIVE COMBAT AIRCRAFT.

    (a) Strategy and Report Required.--Not later than 180 days after
the date of the enactment of this Act, the Secretary of the Air Force,
in consultation with the Commander of United States Transportation
Command, shall--
            (1) develop a comprehensive strategy for the storage,
        sustainment, deployment, and operational support of CCA; and
            (2) submit to the Committees on Armed Services of the
        Senate and the House of Representatives a report on the
        strategy developed under paragraph (1).
    (b) Contents.--The report required under subsection (a)(2) shall
include the following:
            (1) A plan for the storage and sustainment of CCA that
        addresses requirements associated with Agile Combat Employment
        and Agile Combat Deployment operational concepts of the
        Department of the Air Force.
            (2) An assessment of--
                    (A) the extent to which CCA are capable of
                deployment alongside crewed fighter aircraft traveling
                from within the continental United States to forward
                theaters of operation under contested logistics
                conditions; and
                    (B) the mobility feasibility of deploying CCA in
                the manner described in subparagraph (A).
            (3) A description of methods used to store CCA as of the
        date of the submission of the report, disaggregated by location
        type, including--
                    (A) depots located within the continental United
                States;
                    (B) forward operating hubs; and
                    (C) dispersed austere sites.
            (4) For each location specified in paragraph (3), a summary
        of--
                    (A) environmental requirements;
                    (B) security requirements; and
                    (C) shelf-life considerations associated with
                storing CCA at such location.
            (5) A description of the forward support footprint required
        for each CCA detachment, including--
                    (A) personnel;
                    (B) tools;
                    (C) test equipment; and
                    (D) communications support requirements.
            (6) A model addressing expected--
                    (A) attrition of CCA; and
                    (B) repair requirements for CCA.
            (7) A summary of plans of the Department of the Air Force
        for lifecycle sustainment of CCA, including--
                    (A) locations at which major maintenance, overhaul,
                and repair operations will be conducted;
                    (B) plans for spare component pools; and
                    (C) expected turnaround times required to prepare
                CCA for redeployment.
            (8) A summary identifying which components of CCA--
                    (A) may be repaired in the event such component
                becomes inoperable; and
                    (B) must be replaced.
            (9) For each component identified under paragraph (8)(B),
        an estimated timeline for replacement.
            (10) A cost estimate for the sustainment of CCA, including
        identification of--
                    (A) the average cost-per-flight-hour for CCA
                operations;
                    (B) the average cost-per-mission involving CCA; and
                    (C) the primary drivers of sustainment costs.
            (11) A summary of operational assumptions derived from
        relevant war games involving CCA, including identified
        operational gaps, sustainment shortfalls, or risks.
            (12) An assessment of requirements associated with
        deploying CCA at scale in operational theaters, including
        requirements relating to--
                    (A) sealift;
                    (B) airlift;
                    (C) prepositioning;
                    (D) fuel;
                    (E) spare components; and
                    (F) maintenance manpower.
            (13) An assessment of whether deployment of CCA--
                    (A) improves overall utilization or capacity of
                applicable ships, containers, or transportation
                platforms;
                    (B) decreases demand for space on such ships,
                containers, or transportation platforms; and
                    (C) creates new logistical or sustainment burdens
                within operational theaters.
            (14) An assessment of--
                    (A) the marginal costs associated with moving,
                storing, and sustaining CCA at scale; and
                    (B) the primary factors inhibiting deployment of
                CCA in the Indo-Pacific region.
            (15) Resource requirements and an implementation timeline
        for the strategy developed under subsection (a)(1), including
        budget estimates, force structure assumptions, and major
        milestones.
    (c) Federally Funded Research and Development Center Support.--In
carrying out the strategy and report requirements under this section,
the Secretary of the Air Force may leverage the support of one or more
federally funded research and development centers with expertise in
logistics, force design, contested sustainment, autonomous systems, or
defense mobility planning.
    (d) Form.--The report submitted pursuant to subsection (a)(2) shall
be submitted in unclassified form, but may include a classified annex.
    (e) CCA Defined.--In this section, the term ``CCA'' means
autonomous, uncrewed collaborative combat aircraft of the Department of
the Air Force.
                                 <all>